Bare Cost
In this assessment, you need to estimate the bare cost and justify the calculation.
Perform the following tasks:

Task 1:
Using CostWorks, estimate the total bare cost, including overhead and profit (O&P), of a six-story-high, framed steel building with field-welded connections in Atlanta, GA.

Click here to download the data for the assessment. Use Building Construction Cost Data (BCCD) Structural Steel Projects—Section 05 12 23.77—and the provided data to create the estimate.

Task 2:
Assume you are pitching for a contract for this construction. Justify the calculations and the cost to the client in a Word document.

Submission Requirements:
Submit the following files:For the estimate: An Excel file or CostWorks format, including all the data and calculationsFor justification of the estimate: A Word documentFont: Arial, size 12, double-spacingCitation style: APALength: 1–2 pages