CIS 517 WEEK 5 ASSIGNMENT 3 VOIP PART 1 (WORK BREAKDOWN STRUCTURE) Summary

  Overview
    As the project manager for an IT department, you have been assigned  to manage the project of deploying a new VoIP phone system to the  company’s campus. The campus consists of three (3) different buildings,  each with twenty to fifty (20 to 50) workstations. The project must be  completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1.     Write a one to two (1-2) page summary document in which you:

a.     Summarize the project requirements and other assumptions (e.g., budget,  human resources, workload, environmental dependencies, etc.).

b.    Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be  typed, double spaced, using Times New Roman font (size 12), with  one-inch margins on all sides; citations and references must follow APA  or school-specific format. Check with your professor for any additional  instructions.
  • Include a cover page containing the title of the  assignment, the student’s name, the professor’s name, the course title,  and the date. The cover page and the reference page are not included in  the required assignment page length.

"Get 15% discount on your first 3 orders with us"
Use the following coupon
FIRST15

Order Now